Master Specification for Division 01 – 2020: General Requirements (Electronic Document)
CCDC Division 01 provides a series of editable specification templates covering the project specific requirements. This document was developed based on the CCDC 2 ‘Stipulated Price Contract’, but with proper editing it can easily be used with other contracts .
CCDC Division 01 provides a series of editable specification templates covering the project specific requirements. This document was developed based on the CCDC 2 ‘Stipulated Price Contract’, but with proper editing it can easily be used with other contracts .
Spec notes are provided to explain the intended use of each section, assist the editing process, and indicate when coordination is required. Microsoft Word format is available to provide maximum editing flexibility.
CCDC Division 01 is organized according to Master Format section numbers and names:
01 11 00 Summary of Work
01 11 20 Contract Assignment
01 11 22 Assignable Contracts
01 14 00 Work Restrictions
01 21 00 Allowances
01 25 00 Substitution Procedures
01 26 00 Contract Modification Procedures
01 29 00 Payment Procedures
01 31 19 Project Meetings
01 32 00 Construction Progress Documentation
01 33 00 Submittal Procedures
01 35 00 Special Procedures
01 40 00 Quality Requirements
01 51 00 Temporary Utilities
01 52 00 Construction Facilities
01 56 00 Temporary Barriers and Enclosures
01 57 00 Temporary Controls
01 61 00 Common Product Requirements
01 71 00 Examination and Preparation
01 73 00 Execution
01 73 29 Cutting and Patching
01 74 00 Cleaning and Waste Management
01 78 00 Closeout Submittals
01 79 00 Demonstration and Training
01 91 13 General Commissioning Requirements
Powered By GrowthZone